ab.ccfd.joint_pool ccfd · joint_pool |
announced confidence high |
2026-05-25 |
{"per_government_cad": 600000000, "pool_cad": 1200000000, "volume_mt": 75} CAD (nominal) |
2026-09-29 92 d left (announcement) |
2 sources · secondary onlyC$1.2B pool is the sum of the two C$600M per-party maxima (sources state per-party caps; EY also gives CA$600m per party and 75 Mt). Unit CAD applies to the dollar keys; volume_mt is megatonnes CO2e. effective_from is Osler publication date as announcement proxy. |
ab.tier.credit_obs tier · credit_market_price |
observation confidence medium |
2026-05-28 |
{"base": 20, "low": 18} CAD/t (nominal) |
2026-09-29 92 d left (market_observation) |
2 sources · secondary onlyObservation date is the Blakes publication date (2026-05-28) for base C$20; the C$18 low is from CarbonCredits dated 2025-12-01. Neither source names a specific trade date or instrument split (offsets vs EPCs). |
ab.tier.dic_cap tier · direct_investment_credit_cap |
announced confidence high |
2026-05-28 |
{"cap_share": 0.5} fraction |
2026-09-29 92 d left (announcement) |
2 sources · secondary onlyCap applies separately to eligible capital and to operating costs, net of public financial support. effective_from is the Blakes publication date used as an announcement-date proxy; no start date for the cap was fetched. |
ab.tier.floor tier · minimum_transfer_price |
announced confidence high |
2030-01-01 |
{"2030": 60, "2031": 63, "2032": 67, "2033": 71, "2034": 75, "2035": 80, "2036": 85, "2037": 90, "2038": 95, "2039": 100, "2040": 110} CAD/t (nominal) |
2026-09-29 92 d left (announcement) |
2 sources · secondary onlyAnnual values read from EY table (2030 CA$60 through 2040 CA$110); GLJ confirms 2030 $60, 2035 $80, 2040 $110. Floor regulation targeted by 2026-12-31; Osler reports pre-regulation credits are grandfathered from the floor. |
ab.tier.fund_price tier · fund_price |
in_force confidence medium |
2026-01-01 → 2026-12-31 |
{"2026": 95} CAD/t (nominal) |
2026-09-29 172 d left (statute) |
3 sourcesValue $95 read from EY table and CarbonCredits; the regulation (primary_legal) only establishes that the fund price is set by ministerial order under s. 21(2) and does not state the amount. No alberta.ca page stating $95 was found; the ministerial order itself was not fetched. |
ab.tier.fund_price tier · fund_price |
announced confidence high |
2027-01-01 |
{"2027": 100, "2028": 100, "2029": 100, "2030": 115, "2031": 118, "2032": 121, "2033": 124, "2034": 127, "2035": 130, "2040": 140} CAD/t (nominal) |
2026-09-29 92 d left (announcement) |
2 sources · secondary only2027-2035 read row by row from EY table (Blakes and Osler agree: C$100 2027-2029, C$115 2030, +C$3/yr to C$130 in 2035). 2036-2039 are not stated as figures; sources give 1.5%/yr escalation to C$140 in 2040, so only 2040 is recorded. |
ab.tier.threshold tier · mandatory_threshold |
in_force confidence high |
2020-01-01 |
{"mandatory_kt": 100} kt |
2026-09-29 172 d left (statute) |
2 sourcesRegulation in force 2020-01-01 (s. 40(1)). Also covers hydrogen importers above 10,000 t/yr. Opt-in per alberta.ca: facility competing with a regulated facility, emitting 2,000 t CO2e or more, in an emissions-intensive trade-exposed sector. |
bc.obps.credit_obs obps · credit_market_price |
observation confidence low |
2025-12-01 |
{"price": 65} CAD/t (nominal) |
2026-09-29 92 d left (market_observation) |
1 source · secondary onlySingle secondary trade-press observation, approximate ('about'); no exchange or registry price cited. The page shows publication 2025-12-01 with an update date of 2025-11-28, which is inconsistent. |
bc.obps.price obps · compliance_charge_rate |
in_force confidence medium |
2024-01-01 |
{"2024": 80, "2025": 95, "2026": 110, "2027": 125, "2028": 140, "2029": 155, "2030": 170} CAD/t (nominal) |
2026-09-29 172 d left (guidance) |
1 sourceGuidance dated March 2026 (no day shown). Table 3 is an image; WebFetch could not parse the PDF, so the page was rendered locally from the fetched bytes and read visually. The 2024 rate ($80) matches the ~$80 reported; schedule shown is BC's own, and any realignment with the national trajectory is not reflected in this source. |
bc.obps.threshold obps · mandatory_participation_threshold |
in_force confidence high |
2024-04-01 |
{"mandatory_kt": 10} kt |
2026-09-29 172 d left (guidance) |
1 sourceGuidance says 'above 10,000' tCO2e/yr for regulated products; reporting operations are defined as '10,000 or more'. Operations below the threshold may apply to opt in. The B.C. OBPS page (last updated 2026-04-13) gives April 1, 2024 as the start date; text was extracted locally from the fetched PDF bytes. |
fed.carbon.benchmark_path benchmark · minimum_industrial_carbon_price |
announced confidence medium |
2026-01-01 |
{"2026": 95, "2027": 100, "2030": 115, "2035": 130, "2040": 140} CAD/t (nominal) |
2026-09-29 92 d left (announcement) |
3 sources · secondary onlyOnly years explicitly stated by ICAP are in the series; the source implies 2031-34 = 118/121/124/127 (+3/yr) but does not explicitly state 2028-29 = 100. ICAP: new trajectory is part of an updated federal benchmark 'that will be published later in 2026'. The canada.ca industrial carbon pricing page (modified 2026-07-23) was fetched but the trajectory was not found in its extracted text; Osler/GLJ not fetched (2-fetch cap). |
fed.cca.class_rates cca · class_rates |
in_force confidence high |
2026-01-01 |
{"43.1": 0.3, "43.2": 0.5, "53": 0.5, "8": 0.2} fraction |
2026-09-29 172 d left (guidance) |
3 sourcesRates read from the CRA classes page, not Reg. 1100(1)(a). The page says Class 43.2 is limited to property acquired before 2025 and Class 53 to property acquired after 2015 and before 2026, so new 2026 acquisitions may fall in 43.1 or 29/8 instead. |
fed.cca.expensing cca · immediate_expensing_first_year_fraction |
in_force confidence high |
2025-01-01 |
{"2025": 1.0, "2026": 1.0, "2027": 1.0, "2028": 1.0, "2029": 1.0, "2030": 0.75, "2031": 0.75, "2032": 0.55, "2033": 0.55, "2034": 0.0} fraction |
2026-10-06 179 d left (statute) |
9 sources
- Justice Laws Website (Department of Justice Canada): Income Tax Regulations (C.R.C., c. 945), section 1100 (primary_legal; s. 1100(2), formula)
“adjusted by adding the positive or negative amount determined by the formula A(B) + A.1(B.1) − 0.5(C)”
- Justice Laws Website (Department of Justice Canada): Income Tax Regulations (C.R.C., c. 945), section 1100 (primary_legal; s. 1100(2), description of A.1, para. (b)(i))
“if the class is Class 43.1, (i) 2 1/3, for property that became available for use by the taxpayer before 2030”
- Justice Laws Website (Department of Justice Canada): Income Tax Regulations (C.R.C., c. 945), section 1100 (primary_legal; s. 1100(2), description of A.1, para. (b)(ii))
“(ii) 1 1/2, for property that became available for use by the taxpayer in 2030 or 2031”
- Justice Laws Website (Department of Justice Canada): Income Tax Regulations (C.R.C., c. 945), section 1100 (primary_legal; s. 1100(2), description of A.1, para. (b)(iii))
“(iii) 5/6, for property that became available for use by the taxpayer after 2031”
- Justice Laws Website (Department of Justice Canada): Income Tax Regulations (C.R.C., c. 945), section 1104 (primary_legal; s. 1104(4.01), definition of reaccelerated investment incentive property, para. (a))
“(a) is acquired by the taxpayer after 2024 and becomes available for use before 2034”
- EY: Canada substantively enacts capital cost allowance and other business income tax measures in Bill C-15 (secondary; Immediate expensing section)
“immediate expensing is reinstated for manufacturing or processing machinery and equipment included in Class 53, clean energy generation and energy conservation equipment included in …”
- EY: Canada substantively enacts capital cost allowance and other business income tax measures in Bill C-15 (secondary; Immediate expensing section)
“acquired on or after 1 January 2025 and they become available for use before 2030”
- EY: Canada substantively enacts capital cost allowance and other business income tax measures in Bill C-15 (secondary; Immediate expensing section, phase-out)
“phased out for property that becomes available for use after 2029 and before 2034. Property that becomes available for use after 2033 will be …”
- Department of Finance Canada: Legislation passes to implement Budget 2025: Canada Strong (primary_gov; News release, list of measures)
“Introducing a Productivity Super-Deduction – a set of enhanced tax incentives covering all new capital investment”
Value is the whole first-year deduction as a fraction of cost, keyed by available-for-use year, for reaccelerated investment incentive property (acquired after 2024, available for use before 2034). Derived from Reg. 1100(2) as class rate x (1 + A.1 factor), with no half-year reduction because element C excludes this property. Class 43.1 at 30% gives 0.30 x (1 + 7/3) = 1.00 before 2030, 0.30 x 2.5 = 0.75 in 2030-2031, 0.30 x (1 + 5/6) = 0.55 in 2032-2033 (the same fractions follow for Class 43 M&P property, Class 54/56 at 30% and Class 55 at 40%). Class 53 has a flat A.1 factor of 1 (see fed.cca.expensing_classes). 2034 = 0.0 means no enhanced deduction (normal CCA with the half-year rule). Regulations current to 2026-09-21, last amended 2026-06-18. C-15 received Royal Assent on 2026-03-26 (Finance release). |
fed.cca.expensing_classes cca · immediate_expensing_classes |
in_force confidence medium |
2025-01-01 |
{"43.1": "eligible", "53": 1.0, "54": "eligible", "55": "eligible", "56": "eligible"} text |
2026-10-06 179 d left (statute) |
4 sources
- Justice Laws Website (Department of Justice Canada): Income Tax Regulations (C.R.C., c. 945), section 1100 (primary_legal; s. 1100(2), description of A.1, para. (f)(i))
“if the property is included in Class 53 or — for property acquired after 2025 — is included in Class 43”
- Justice Laws Website (Department of Justice Canada): Income Tax Regulations (C.R.C., c. 945), section 1100 (primary_legal; s. 1100(2), description of A.1, para. (f)(i))
“(i) 1, for property included in Class 53,”
- EY: Canada substantively enacts capital cost allowance and other business income tax measures in Bill C-15 (secondary; CCA - reaccelerated investment incentive and immediate expensing)
“immediate expensing is reinstated for manufacturing or processing machinery and equipment included in Class 53”
- EY: Canada substantively enacts capital cost allowance and other business income tax measures in Bill C-15 (secondary; CCA - reaccelerated investment incentive and immediate expensing)
“clean energy generation and energy conservation equipment included in Class 43.1, and zero-emission vehicles included in Classes 54, 55 and 56”
Classes eligible for the fed.cca.expensing first-year deduction (property acquired on or after 2025-01-01). `eligible` follows the fed.cca.expensing phase-out; a number is a first-year fraction that holds for every year the series is positive. Class 53 = 1.0 because its A.1 factor is 1 in every year at a 50% rate (0.50 x 2); Class 53 itself only takes property acquired before 2026. Class 43.2 is not listed in A.1 of Reg. 1100(2) and takes property acquired before 2025 only, so it is not listed; a class absent from this table gets normal declining-balance CCA. Primary text fetched 2026-10-06. |
fed.ccus_itc.rates ccus_itc · rates |
in_force confidence high |
2022-01-01 → 2040-12-31 |
{"capture_2036_2040": 0.25, "capture_to_2035": 0.5, "dac_2036_2040": 0.3, "dac_to_2035": 0.6, "tsu_2036_2040": 0.1875, "tsu_to_2035": 0.375} fraction |
2026-10-06 179 d left (statute) |
7 sources
- Justice Laws Website (Department of Justice Canada): Income Tax Act (R.S.C., 1985, c. 1 (5th Supp.)), section 127.44 (primary_legal; s. 127.44(1), definition of specified percentage, para. (a)(i))
“(i) directly from ambient air (A) after 2021 and before 2036, 60%, (B) after 2035 and before 2041, 30%”
- Justice Laws Website (Department of Justice Canada): Income Tax Act (R.S.C., 1985, c. 1 (5th Supp.)), section 127.44 (primary_legal; s. 127.44(1), definition of specified percentage, para. (a)(ii))
“(ii) other than directly from ambient air (A) after 2021 and before 2036, 50%, (B) after 2035 and before 2041, 25%”
- Justice Laws Website (Department of Justice Canada): Income Tax Act (R.S.C., 1985, c. 1 (5th Supp.)), section 127.44 (primary_legal; s. 127.44(1), definition of specified percentage, para. (b))
“(i) after 2021 and before 2036, 37 1/2%, (ii) after 2035 and before 2041, 18 3/4%, or (iii) after 2040, 0%”
- Gowling WLG: Clean economy investment tax credits: the latest from the FES 2024 and Budget 2025 (secondary; (e) Carbon Capture, Utilization, and Storage ITC)
“60 per cent for eligible capture equipment used in a direct air capture project (reduced to 30 per cent for expenditures from 2031 to 2040)”
- Gowling WLG: Clean economy investment tax credits: the latest from the FES 2024 and Budget 2025 (secondary; (e) Carbon Capture, Utilization, and Storage ITC)
“50 per cent for all other eligible capture equipment (reduced to 25 per cent ...) and 37.5 per cent ... (reduced to 18.75 per cent”
- Gowling WLG: Clean economy investment tax credits: the latest from the FES 2024 and Budget 2025 (secondary; (e) Carbon Capture, Utilization, and Storage ITC, Budget 2025 paragraph)
“so that the full credit rates will apply to eligible expenditures incurred from the start of 2022 to the end of 2035.”
- Torys LLP: Clean economy investment tax credits (Torys Quarterly, Q2 2026) (secondary; CCUS ITC discussion)
“the reduced credit rates will apply from 2036 to the end of 2040”
Rates by when the expenditure is incurred (capture from ambient air, other capture, and transportation, storage or use), read from the consolidated ITA (current to 2026-09-21, last amended 2026-06-18), which shows the Budget 2025 extension of the full rates to the end of 2035. The kernel applies the rate chosen with project.itc_rate_key; it does not split expenditures by year incurred. Upgraded from proposed (secondary sources only) on 2026-10-06; resolves D2. |
fed.ce_itc.rate ce_itc · specified_percentage |
in_force confidence high |
2024-04-16 → 2034-12-31 |
0.15 fraction |
2026-09-30 173 d left (statute) |
1 sourceRate for clean electricity property acquired 2024-04-16 to 2034-12-31 (nil before and after). The credit is available only to a "qualifying entity" (qualifying corporation or qualifying trust, s. 127.491(1)); the kernel does not map case entity types to that definition and does not apply the labour-requirement reduction (s. 127.46), and says so in a warning. published = the Act's last-amended date. |
fed.cgf.ccfd cgf · carbon_contracts_for_difference |
in_force confidence medium |
2023-12-20 |
{"allocation": "up to $7 billion of CGF\u0027s $15 billion capital", "example": "Entropy: up to 185,000 t/yr for 15 years at $86.50/t", "program": "CGF carbon contracts for difference", "terms": "negotiated with individual companies"} text (nominal) |
2026-09-29 92 d left (announcement) |
2 sourcesProgram existence, allocation and first deal (Entropy, Dec 2023) confirmed; contracts are negotiated deal-by-deal. No Budget 2025 commitment found in either fetched source (both 2023); no cgf-fcc.ca page found by search. |
fed.ct_itc.domestic_content ct_itc · domestic_content_requirement |
proposed confidence high |
2026-02-13 |
{"consultation_close": "2026-03-13", "consultation_open": "2026-02-13", "credits": "Clean Technology ITC; Clean Electricity ITC", "decision": "none announced", "status": "consultation closed; outcome pending", "thresholds": "not specified"} text |
2026-09-29 92 d left (announcement) |
3 sourcesNo thresholds or effective dates were proposed in the release; no outcome found in either fetched source (Torys Q2 2026 says it remains to be seen). Torys page shows no exact publication date. |
fed.ct_itc.eligibility_classes ct_itc · eligibility_classes |
in_force confidence medium |
2023-03-28 → 2034-12-31 |
{"electric_boiler": "not_listed", "heat_pump_air_source": "likely", "heat_pump_ground_source": "likely", "heat_pump_process": "not_listed", "small_modular_reactor": "likely", "solar_pv": "likely", "stationary_storage": "likely", "wind": "likely"} text |
2026-09-29 172 d left (guidance) |
3 sourcesPublished guides exist for "Photovoltaic Electrical Generation Equipment", "Wind Energy Conversion Systems", "Electrical Energy Storage Equipment" and "Air-Source Heat Pump Systems" (likely); ground-source heat pumps and SMRs are listed with guides "(under development)" (likely, pending guide). Process/waste-heat heat pumps and electric boilers are not mentioned (not_listed); the air-source guide covers only heat from outside air, excludes back-up equipment and in-building distribution, and says hybrid systems are assessed case by case by the Class 43.1/43.2 Secretariat. |
fed.ct_itc.entities ct_itc · eligible_entities |
in_force confidence high |
2023-03-28 |
{"crown": false, "municipal": false, "reit": true, "tax_exempt": false, "taxable_corp": true} text |
2026-09-29 172 d left (statute) |
2 sourcesThe page lists only these two claimant types (a must-be list, including as partnership members). crown/municipal/tax_exempt = false is inferred from that exhaustive list and the "taxable" requirement; the page does not name those exclusions explicitly. |
fed.ct_itc.labour_rate ct_itc · labour_reduced_rate |
in_force confidence high |
2023-03-28 → 2033-12-31 |
0.2 fraction |
2026-09-29 172 d left (statute) |
2 sources0.20 applies to property available for use 2023-03-28 to 2033-12-31 when the taxpayer does not elect into the labour requirements; the 2034 equivalent is 0.05 (15% less 10 points). |
fed.ct_itc.rate_schedule ct_itc · rate_schedule |
in_force confidence high |
2023-03-28 |
{"2023": 0.3, "2024": 0.3, "2025": 0.3, "2026": 0.3, "2027": 0.3, "2028": 0.3, "2029": 0.3, "2030": 0.3, "2031": 0.3, "2032": 0.3, "2033": 0.3, "2034": 0.15, "2035": 0.0} fraction |
2026-09-29 172 d left (statute) |
2 sourcesRates are maxima ("up to") keyed by the year property is acquired and becomes available for use; 2023 applies from March 28, 2023. 2035 = 0.0 because the page states "The Clean Technology ITC will be unavailable after 2034." ITA s.127.45 was not fetched. |
fed.fuel_charge fuel_charge · rate |
in_force confidence high |
2025-04-01 |
0 CAD/t (nominal) |
2026-09-29 172 d left (statute) |
1 sourceFuel charge rates are statutorily per unit of fuel; all set to zero, recorded as 0 CAD/t equivalent. Release also states 'Beginning on April 1, 2025, the fuel charge ceases to apply.' |
fed.ggppa.schedule4 ggppa · excess_emissions_charge |
in_force confidence high |
2018-01-01 |
{"2018": 10, "2019": 20, "2020": 30, "2021": 40, "2022": 50, "2023": 65, "2024": 80, "2025": 95, "2026": 110, "2027": 125, "2028": 140, "2029": 155, "2030": 170} CAD/t (nominal) |
2026-09-29 172 d left (statute) |
1 sourcePage states 'Act current to 2026-09-21 and last amended on 2025-06-02'; the statutory schedule still runs to $170 in 2030 and has not been amended to the May 2026 announced trajectory ($95 in 2026). |
fed.nir.gas_ef nir · natural_gas_co2_emission_factor |
observation confidence medium |
2026-01-01 |
{"AB": 0.0511, "BC": 0.0512, "ON": 0.05, "QC": 0.0502} t/GJ |
2026-09-29 392 d left (statistic) |
1 sourceCO2 only, marketable gas, factors for 2026 sourced by ECCC from NIR 1990-2024: ON 1921, QC 1926, AB 1962, BC 1966 g CO2/m3 divided by HHV 38.39 MJ/m3 = 50.04, 50.17, 51.11, 51.21 g/MJ (t/GJ = /1000). CH4+N2O (0.037 + 0.035 g/m3, residential/commercial, Table 2.3) add negligible mass; NIR 2026 Annex 6 itself not fetched. |
fed.nir.grid_ef nir · grid_consumption_intensity |
observation confidence medium |
2024-01-01 |
{"AB": 346.102, "BC": 18.064, "ON": 73.313, "QC": 2.565} g/kWh |
2026-09-30 393 d left (statistic) |
4 sources
- Environment and Climate Change Canada: National Inventory Report 1990-2024, Annex 7: Electricity in Canada: Summary and Intensity Tables (EN_Annex7_Electricity_Intensity.xlsx) (primary_gov; Table A7–6 (Quebec), row "Consumption Intensity (g CO2 eq / kWh)", column 2024a)
“Consumption Intensity (g CO2 eq / kWh)”
- Environment and Climate Change Canada: National Inventory Report 1990-2024, Annex 7: Electricity in Canada: Summary and Intensity Tables (EN_Annex7_Electricity_Intensity.xlsx) (primary_gov; Table A7–7 (Ontario), row "Consumption Intensity (g CO2 eq / kWh)", column 2024a)
“Consumption Intensity (g CO2 eq / kWh)”
- Environment and Climate Change Canada: National Inventory Report 1990-2024, Annex 7: Electricity in Canada: Summary and Intensity Tables (EN_Annex7_Electricity_Intensity.xlsx) (primary_gov; Table A7–10 (Alberta), row "Consumption Intensity (g CO2 eq / kWh)", column 2024a)
“Consumption Intensity (g CO2 eq / kWh)”
- Environment and Climate Change Canada: National Inventory Report 1990-2024, Annex 7: Electricity in Canada: Summary and Intensity Tables (EN_Annex7_Electricity_Intensity.xlsx) (primary_gov; Table A7–11 (British Columbia), row "Consumption Intensity (g CO2 eq / kWh)", column 2024a)
“Consumption Intensity (g CO2 eq / kWh)”
Average grid intensity of electricity consumed (g CO2e/kWh), data year 2024, which ECCC marks preliminary (note a). Consumption intensity is used rather than generation intensity (QC 2.097, ON 64.909, AB 334.757, BC 16.712) because it includes unallocated energy and SF6, i.e. the load a facility adds. Final 2023 consumption values - QC 1.873, ON 58.862, AB 433.868, BC 17.956. Read from the xlsx (sha256 206ebf72ed44a6da...) via the ECCC Data Mart file API; the Data Mart page itself is a JavaScript app. Average, not marginal - for marginal emissions use policy.grid_factor marginal. |
fed.obps.credit_obs obps · surplus_credit_price |
observation confidence low |
2025-12-01 |
{"price": 37.5} CAD/t (nominal) |
2026-09-29 92 d left (market_observation) |
1 source · secondary onlyPhrased as 'as low as about' CAD 37.50 (a low-end quote, not an assessed index); the article attributes market commentary to ClearBlue Markets but gives no specific observation date, so effective_from is the article date (page also shows 'Updated: November 28, 2025'). |
fed.obps.thresholds obps · coverage_thresholds |
in_force confidence medium |
2019-01-01 |
{"mandatory_kt": 50, "opt_in_kt": 10} kt |
2026-09-29 172 d left (guidance) |
3 sourcesThresholds stated in the 2018 regulatory framework page (date modified 2018-01-31); the current ECCC OBPS page (modified 2026-02-06) confirms the 10 kt voluntary figure but its text did not state 50 kt. OBPS Regulations s. 8 not fetched; effective_from is the OBPS start year. |
on.eps.epu_obs eps · epu_market_price |
observation confidence medium |
2025-12-01 |
{"discount_high": 0.2, "discount_low": 0.15, "price": 72} CAD/t (nominal) |
2026-09-29 92 d left (market_observation) |
2 sources · secondary onlyDiscount keys are fractions and price is CAD/t. CarbonCredits compares the C$72 trade to a regulatory level of CAD 80 (a ~10% discount), not to the 2025 C$95 charge; IETA brief is dated September 2025 (day not shown). |
on.eps.price_schedule eps · excess_emissions_charge |
in_force confidence medium |
2022-01-01 → 2030-12-31 |
{"2022": 50, "2023": 65, "2024": 80, "2025": 95, "2026": 110, "2027": 125, "2028": 140, "2029": 155, "2030": 170} CAD/t (nominal) |
2026-09-29 172 d left (guidance) |
3 sourcesSeries by compliance year from Enbridge table, matching IETA. The ontario.ca table lists the same prices one year later (2023 $50 to 2031 $170), likely keyed to the year EEUs are paid; O. Reg. 241/19 on e-Laws did not render. No fetched source reports any announced alignment of the EPS with the new national price path. |
on.eps.thresholds eps · coverage_thresholds |
in_force confidence high |
2022-01-01 |
{"mandatory_kt": 50, "opt_in_kt": 10} kt |
2026-09-29 172 d left (guidance) |
2 sourcesontario.ca gives the mandatory test as reported emissions of at least 50,000 t CO2e; opt-in limited to regulated industrial activities. EPS pricing took effect 2022-01-01 per IETA. |
qc.spede.auction_obs spede · joint_auction_result |
observation confidence high |
2026-08-19 |
{"reserve": 38.81, "settlement": 45.11} CAD/t (nominal) |
2026-09-29 92 d left (market_observation) |
1 sourceCurrent-auction CAD figures at an Auction Exchange Rate of 1.3889 CAD/USD (USD: settlement 32.48, reserve 27.94). The joint reserve of C$38.81 is the California USD reserve converted at that rate; Québec's own 2026 annual reserve is C$26.47. Text was extracted locally from the fetched PDF bytes. |
qc.spede.coverage spede · coverage |
in_force confidence high |
2015-01-01 |
{"emitter_threshold_kt": 25, "fuel_distributors_covered": "yes"} text |
2026-09-29 172 d left (guidance) |
2 sourcesFuel distributors (including natural gas) have been covered since the second compliance period starting 2015-01-01, once they distribute more than 200 litres of fuel; emitters have been covered since 2013. The ICAP URL given (icapcarbonaction.com/en/node/1147) resolves to 'Canada publishes new carbon price trajectory' (2026-05-27), not the Québec factsheet, so it was not used. |
qc.spede.reserve_escalation spede · reserve_price_escalation |
in_force confidence high |
2026-01-01 |
{"plus_inflation": "yes", "real_rate": 0.05} fraction |
2026-09-29 172 d left (guidance) |
1 sourceThe notice cites Article 49 of the Québec Regulation. Québec's inflation term is the indexation rate in s. 83.3 of the Financial Administration Act, not CPI (2.05% for 2026: C$24.73 to C$26.47). effective_from is the 2026 notice year, since the source gives no start date for the formula. legisquebec.gouv.qc.ca returned 403. |
ref.electricity.large reference_price · electricity_price_large_power |
observation confidence high |
2025-04-01 |
{"AB": 8.02, "BC": 8.42, "ON": 12.8, "QC": 5.83} cents/kWh (nominal) |
2026-09-29 392 d left (statistic) |
1 source · secondary only
- Hydro-Québec: Comparison of Electricity Prices in Major North American Cities 2025 (Rates in effect April 1, 2025) (secondary; Section 1, Average Prices on April 1, 2025, Summary Table (excluding taxes), Large-Power 5,000 kW / 3,060,000 kWh / 85%, p. 18)
“AVERAGE PRICES ON APRIL 1, 2025 (in ¢/kWh) Summary Table (excluding taxes) … Montréal, QC 8.29 12.08 14.70 9.71 8.25 5.83 5.52”
Cities used: QC=Montréal, ON=Toronto, AB=Calgary, BC=Vancouver (Edmonton 10.17). Prices are CAD and exclude taxes; rates as of April 1, 2025. Toronto is a Hydro-Québec estimate (footnote 4). The report shows no publication date (legal deposit Q4 2025); the table was read from the fetched PDF via local extraction and a page render. |
ref.electricity.medium reference_price · electricity_price_medium_power |
observation confidence high |
2025-04-01 |
{"AB": 11.07, "BC": 9.73, "ON": 17.27, "QC": 9.71} cents/kWh (nominal) |
2026-09-29 392 d left (statistic) |
1 source · secondary onlyCities used: QC=Montréal, ON=Toronto, AB=Calgary, BC=Vancouver (Edmonton 12.30). Prices are CAD, exclude taxes, 56% load factor; rates as of April 1, 2025. Toronto is a Hydro-Québec estimate (footnote 4). The report shows no publication date (legal deposit Q4 2025). |
ref.tax.corporate corporate_income_tax · combined_general_rate |
in_force confidence medium |
2026-01-01 |
{"AB": 0.23, "BC": 0.27, "ON": 0.265, "QC": 0.265} fraction |
2026-09-29 172 d left (statute) |
2 sourcesFederal 15% + provincial general rate: AB 0.15+0.08=0.23; ON 0.15+0.115=0.265; BC 0.15+0.12=0.27; QC 0.15+0.115=0.265. ON (11.5%) and BC (12%) also appear in the CRA higher-rate table; AB and QC are excluded from the CRA table (no collection agreements), so those rates rest on the secondary source only. The Ontario 2026 change affects only the small business rate. |